Floodplain Logo

South Platte NRD

Approved Plans


SPNRD Overappropriated IMP (August 2009)

Orders


ORDER ADOPTING SOUTH PLATTE NATURAL RESOURCES DISTRICT INTEGRATED MANAGEMENT PLAN AND ASSOCIATED SURFACE WATER CONTROLS (August 13, 2009)
Order adopting South Platte Natural Resources District/DNR Integrated Management Plan (June 20, 2008)
South Platte NRD/DNR Integrated Management Plan (June 20, 2008)
Public Notice of adoption of South Platte NRD/DNR Integrated Management Plan (June 20, 2008)
FULLY APPROPRIATED BASIN ORDER (9/30/04)
ORDER DESIGNATING OVERAPPROPRIATED RIVER BASINS, SUBBASINS, OR REACHES, AND DESCRIBING HYDROLOGICALLY CONNECTED GEOGRAPHIC AREA
  • Legal description of the Geographic Area within which Surface Water & Ground Water are Hydrologically Connected for purpose of the Overappropriated Designation.
    (Appendix 1)
  • Designation of Geographic Area within which Surface Water & Ground Water are Hydrologically Connected for purpose of the Overappropriated Designation.
    (Basin Map - Appendix 2)

Notices


Other Documents


Central Platte NRD

DNR | FAQ | Search | Site Index